Products

Universal hose ends

Universal hose ends

CONSTRUCTION:

1.Construction of Universal hose ends

   -Description: Air hose coupling(Universal air coupling),Universal air coupling European type / Chicago coupling European type.

   -Casting method: Investment casting ,Sand casting.

   -Sizes: From 1-1/4"   1-1/2"   2".
  -Parts:Male end ,Female end,Hose end W/O collar,Hose end With collar.
  -Body material:Carton steel, Malleable Iron.

.

Pipe fitting connector carbon steel air hose coupling universal hose end

 

微信截图_20230210105558.jpg

微信截图_20230210105611.jpg

微信截图_20230210105618.jpg

微信截图_20230210105626.jpg

微信截图_20230210105633.jpg

微信截图_20230210105639.jpg

  

The application of the hydraulic hose:

  The high pressure hose is mainly used for Mine hydraulic support ,oilfield exploitation ,object construction ,lifting transport ,metallurgic forging ,mine equipment, ship, injection molding machinery,agricultural machinery , all kinds of machine tools and various industrial sectors.


  Machanization and automation in the hydraulic system of conveying with a certain pressure(high pressure) and the temperature of the oil-based(such as mineral oil, soluble oil, hydraulic oil, fuel oil and lubricants) and water-based liquid (such as Emulsion, the oil-water emulsion, water) and liquid transmission used.The maximum working pressure-resistant up to 70-100MPa.


More Products:

H9275309660ee421c9e1346935382faddH.jpg

微信截图_20230210094906.jpg

微信截图_20230210094808.jpg

Hf0aec1d5fa284b30a82019f582186fc0S.jpg

微信截图_20230209164157.jpg

微信截图_20230209164225.jpg

HTB1NEokX0fvK1RjSszhq6AcGFXad.jpg

微信截图_20230209142105.jpg

微信截图_20230210095104.jpg

微信截图_20230209142238.jpg

HTB1rO.cX2fsK1RjSszbq6AqBXXaj.jpg

 

 


Certificates

123.jpg

 

 

Why Do You Choose Us?

HTB1C6dfA29TBuNjy1zbq6xpepXas_看图王.jpg 

FAQ:
1. What is your terms of packing?
— — Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.

2. What is your terms of payment?
— — T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

3. What is your terms of delivery?
— — EXW, FOB, CFR, CIF, DDU.

4. How about your delivery time?
— — Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

5. Can you produce according to the samples?
— — Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

6. What is your sample policy?
— — We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.

7: How do you make our business long-term and good relationship?
— — We keep good quality and competitive price to ensure our customers benefit ; We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

 

微信截图_20230210110213.jpg